An oilfield field ticket template you can copy
This is an oilfield field ticket template for Alberta service crews. It is a starting point, not a standard. Your customer may require its own format or portal, so ask before the job. Where they do not, copy the fields below into a sheet, a form or a notepad on the truck.
| Field | What to write |
|---|---|
| Ticket number | Your own running number, so none go missing. |
| Date and time on site | Start and finish. |
| Customer, job and PO | Company, job name, PO or AFE number, work order. |
| Location | Lease, well site or plant area, and any landmark a reader would need. |
| Requested by | Name, title and time they asked, and what they said in a few words. |
| In scope or extra | Tick one. For extra work, note who agreed. |
| Crew | Names or roles with hours for each person. |
| Equipment | What was used and for how long, with unit numbers. |
| Materials | Item and quantity. |
| Description | One or two plain sentences on what was done. |
| Photos | Number attached, with time stamps. |
| Customer sign-off | Name, title, time, signature. |
A filled-in sample (invented)
Invented for illustration. The names, numbers and place are made up.
Ticket #T-0412 · 2026-10-17 · 07:30 to 11:30
Customer: [Operator name] · Job: Pad 12 flowline tie-in · PO: [number]
Location: [Lease / pad name], near Nisku
Requested by: [Name, title] at 08:10: “extend the line past the east berm”
Scope: extra (not in original work order)
Crew: 3 people × 4 hours · Equipment: loader, 4 hours; welding unit, 2 hours
Materials: 18 m of 2-inch pipe, 6 fittings
Description: Extended flowline as requested; pressure-tested after tie-in.
Photos: 3 attached
Signed: [Name, title] at 11:45
How to use it so it gets you paid
- Fill it in on site, not from memory. A ticket written a week later is easy to dispute.
- Get the signature before the crew leaves, or that afternoon. If it is unsigned the next morning, send one polite reminder.
- Mark extras as extras. A common dispute is whether anyone agreed to the extra work, not whether it was done.
- Put the signed ticket with the job file and match it to a line on the next invoice.
- At month end, compare signed tickets to invoice lines. Signed but not billed is money left on the table.
The full routine, with what to do when a supervisor will not sign, is in the field ticket sign-off checklist.
Paper, spreadsheet or phone form
Paper
A carbon-copy book is cheap and works without signal. The cost is typing it up later and losing the odd page.
Spreadsheet
One row per ticket with the fields above. Good for tracking which tickets are signed and which are billed. Photos live in a folder named by ticket number.
Phone form
A short form the crew fills in on site, with a text link for the supervisor to sign. Get-Paid does this (built and tested on sample data), and you can also build one with common form tools. Check that your customer accepts electronic sign-off.
Where this connects to the invoice
Alberta's prompt payment rules expect a proper invoice, with a description of the work and the period it covers, and the payment clock starts from when the owner receives it. Signed tickets give you the dates and descriptions to build the invoice from, so tickets that are signed and filed promptly make a complete proper invoice faster to send. See the proper invoice checklist and the payment clock cheat sheet, both sourced. Many, but not all, oil and gas contracts fall under the Prompt Payment and Construction Lien Act; it applies where the contract gives rise to lien rights, and some work is excluded. If you are a subcontractor, your clock runs from when the contractor is paid. Check your contract and the Act (see Bennett Jones' summary). This is general information, not legal advice.
Who this is for
It suits service companies around Nisku, Leduc and the Edmonton area that bill extras by the hour and chase signatures. See oilfield services and construction subs, or Get-Paid for the tool we are building. No guarantee of results.
Questions people ask
What is an oilfield field ticket?
A field ticket is the record of work done on site: who, what, when, with which crew, equipment and materials, and who approved it. Contractors use it to support the invoice, especially for extra or time-and-materials work.
What should an oilfield field ticket template include?
Date, job or PO number, location, who requested the work, crew and hours, equipment and hours, materials with quantities, a plain description, photos, and the name, title, time and signature of the customer's representative.
Is there a standard field ticket format for Alberta?
Not that I know of. Many customers have their own required format or portal, so ask for theirs before the job and use this template as your own record where they have none.
Who should sign a field ticket?
Someone with authority on the customer's side, such as the site supervisor or the company man. Record their name, title and the time they signed.
How soon should a field ticket be signed?
Ideally the same day, before the crew leaves site or that afternoon. If it is still unsigned the next morning, send one short reminder.
Can a field ticket be signed on a phone?
Often yes. A text or email link to a short form works if your customer accepts electronic sign-off. Check their requirements.
How do field tickets connect to getting paid?
The invoice should match the signed tickets. For contracts covered by the Act (many oil and gas contracts, not all), Alberta's prompt payment rules expect a proper invoice, and tickets give you the dates and descriptions. See the payment clock cheat sheet. Not legal advice; check the Act.
Does Evenstead provide a field ticket system?
Get-Paid is built to do this routine: the crew fills a short phone form, the supervisor signs by text link, unsigned tickets get reminders. It is not live yet. The template here works on paper, in a sheet or a form today.